VILLAGE QUAY, RHODES
Brief
Design and install a monorail and swinging stage installation to provide rapid access over the full extent of the residential tower façade for installation of architectural window framing. System to permit the stage to operate above the projecting balconies and avoid wire ropes contacting the finished facade.
Features
- 9m long swinging stage travelling on 40m long monorail.
- Powered wire rope reelers to gather and manage the wire ropes
- Working Load Limit 3 persons + 200kg materials
- Stage lengths variable up to 12m
- Load Lmiters to manage risk of fouling with façade elements and overloading the monorail.
Share
Project Name
Village Quay, Rhodes
Principal
Billbergia
Installation
Traveling Swinging Stage On Monorail
Categories
Related items
BARANGAROO TOWER 1
Brief Design and install a custom cantilevered loading platform to install 3 sections of a…
Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF: Suspended Scaffolding and overhead protection. FEATURES: Suspended and encapsulated catch deck over water –…
Sydney University – Engineering Building
BRIEF: Design & Installation of specialized scaffolding throughout the project FEATURES: Internal birdcage scaffold &…
NORTHCONNEX – DARLING MILLS BRIDGE WIDENING
Brief Design & install various stretcher stair installations to provide safe access to the abutments…