SYDNEY HARBOUR BRIDGE REFURBISHMENT
Brief
Design and install a suspended scaffold installation to the underside of the Sydney Harbour Bridge southern approach, over Cumberland Street, to facilitate grit blasting and painting of the bridge trusses and cross frames while maintaining unrestricted pedestrian and vehicle access, and without disruption to BridgeClimb operations.
Features
- 30m long aluminium trusses delivered as pre-assembled modules and hoisted into position.
- Scaffold suspended from X wire rope slings anchored to the bridge stringers.
- Containment Deck Area – 32m x 22m
- Height of perimeter scaffolds above deck – 12m
- Overhead protection acccess tunnel for BridgeClimb tour groups.
Share
Project Name
Sydney Harbour Bridge Refurbishment
Principal
Roads & Maritme Services
Installation
Suspended Underbridge Perimeter Scaffolds & Containment Deck
Related items
CENTRAL PARK
Brief Design and install modular special duty swinging stages to facilitate installation and planting of…
Transport for NSW – Sydney Harbour Bridge
BRIEF: Design, Install & Relocation of Cross Girder Scaffolds suspended from the underside of the…
Sydney University – Engineering Building
BRIEF: Design & Installation of specialized scaffolding throughout the project FEATURES: Internal birdcage scaffold &…
Barangaroo
BARANGAROO TOWER 3 BRIEF: Design & Install a cantilevered catch & containment platform installation to…