Transport for NSW – Sydney Harbour Bridge
BRIEF:
Design, Install & Relocation of Cross Girder Scaffolds suspended from the underside of the road deck for blasting and painting works.
FEATURES:
- 3 x Suspended Scaffolds being relocated along bridge over 18 locations – Each 6m wide, 50m Long with 2 working levels
- Suspended from bridge girders using chains
- Configured to allow free travel of main span gantries below
Share
Categories
Related items
CENTRAL PARK – SKYDECK
Brief Design and install a large area work platform installation to be suspended from the…
SYDNEY HARBOUR BRIDGE REFURBISHMENT
Brief Design and install a suspended scaffold installation to the underside of the Sydney Harbour…
Built Core – 4 & 6-8 Parramatta Square – Link Bridge Installation Scaffold
BRIEF: Design and install containment and work perimeter scaffold spanning from one building to adjacent…
Sydney Harbour Bridge – Main Span Cross Girder Painting
Brief Design & Install suspended encapsulation scaffold installations to facilitate preparation and painting of the…