Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF:
Suspended Scaffolding and overhead protection.
FEATURES:
- Suspended and encapsulated catch deck over water – 40m x 4m
- 10kPa overhead protection over roadways
Share
Categories
Related items
LAWRENCE HARGRAVE DRIVE
Brief Design and install an access and containment scaffold suspended from the LHD footpath to…
WIN STADIUM, WOLLONGONG
Brief Design and install a propping tower installation to support the 100 Tonne stadium roof…
Transport for NSW – Sydney Harbour Bridge
BRIEF: Design, Install & Relocation of Cross Girder Scaffolds suspended from the underside of the…
Sydney Harbour Bridge – Main Span Cross Girder Painting
Brief Design & Install suspended encapsulation scaffold installations to facilitate preparation and painting of the…