WIN STADIUM, WOLLONGONG
Brief
Design and install a propping tower installation to support the 100 Tonne stadium roof truss during removal and replacement. Ensure that the propping scaffold is also designed to resist horizontal forces imposed on the roof structure from 1 in 100 year wind loading.
Features
- Height of Tower – 18m at highest point.
- Incorporates Layher extra heavy duty quad jacks and u-heads.
- Anchored down through the stadium levels to base slab using heavy duty push/pull props
- Tower anchorage designed tension and compression to resist wind loads.
Share
Project Name
Win Stadium, Wollongong
Principal
Lipman
Installation
Mega Duty High Propping Tower & Buttress
Categories
Related items
MERCURE HOTEL – BALCONY REMEDIATION SCAFFOLD
Brief Design and Install a 50m high façade scaffold to facilitate remediation and painting of…
Transport for NSW – Sydney Harbour Bridge
BRIEF: Design, Install & Relocation of Cross Girder Scaffolds suspended from the underside of the…
BARANGAROO TOWER 1
Brief Design and install a custom cantilevered loading platform to install 3 sections of a…
CENTRAL PARK
Brief Design and install modular special duty swinging stages to facilitate installation and planting of…