BARANGAROO TOWER 1
Brief
Design and install a custom cantilevered loading platform to install 3 sections of a heat recovery unit at the plantroom floors at Barangaroo tower 1. The H.R.U. was split into 3 sections, weiging 1020kg, 1480kg and 1900kg. Loading platform needed to be flush with the slab, as height clearance was approx. 140mm from top of machine unit to soffit of slab above.
Features
- Took place of traditional loading platform and offered lower profile to slab to be accessed
- Safely built the main structure within slab edges and extended outward within handrails
- High loading capacity – 1.9T at 4m extension from slab
Share
Project Name
BARANGAROO TOWER 1
Principal
Lend Lease
Installation
Heavy Duty Cantilevered Loading Platform
Categories
Related items
MERCURE HOTEL – BALCONY REMEDIATION SCAFFOLD
Brief Design and Install a 50m high façade scaffold to facilitate remediation and painting of…
Sydney University – Engineering Building
BRIEF: Design & Installation of specialized scaffolding throughout the project FEATURES: Internal birdcage scaffold &…
CENTRAL PARK
Brief Design and install modular special duty swinging stages to facilitate installation and planting of…
Sydney Harbour Bridge – Main Span Cross Girder Painting
Brief Design & Install suspended encapsulation scaffold installations to facilitate preparation and painting of the…