MERCURE HOTEL – BALCONY REMEDIATION SCAFFOLD
Brief
Design and Install a 50m high façade scaffold to facilitate remediation and painting of the hotel balconies, including design and fabrication of special ties to clamp the scaffold to the balcony structures, avoiding the need for drilled-in anchors while resisting very high wind loads.
Features
- 50m High Scaffold with working decks every 2m.
- Access from the balconies as well as via internal ladder access.
- Special tie-in clamps.
Share
Project Name
Mercure Hotel - Balcony Remediation Scaffold
Principal
MBS PAINTING
Installation
50M High Facade Scaffold Tower
Categories
Related items
Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF: Suspended Scaffolding and overhead protection. FEATURES: Suspended and encapsulated catch deck over water –…
BARANGAROO TOWER 1
Brief Design and install a falsework solution to allow pouring of crane penetration infills at…
Sydney Harbour Bridge – Main Span Cross Girder Painting
Brief Design & Install suspended encapsulation scaffold installations to facilitate preparation and painting of the…
NORTHCONNEX TUNNEL – WILSON SHAFT
Brief Design & Install a suspended access stairs which can be progressively extended down the…