BRIDGEPOINT, SPIT JUNCTION
Brief
Design & Install a suspended scaffold installation to the underside of the pedestrian bridge over Military Road, Spit Junction, to facilitate demolition of the existing bridge superstructure and construction of a new modern superstructure with billboards. The design and installation methodology to minimise traffic disruption and permit all demolition and construction works to proceed over the live traffic without restrictions.
Fatures
- Preassembled 12m long trusses (9) delivered on semi-trailer and craned into position.
- Containment Deck Area -28m x 12m
- three upper working levels along both sides
- Ties designed to permit unimpeded construction of the new bridge structure
- Double skin containment system with printed façade replication
Share
Project Name
Bridgepoint, SPIT JUNCTION
Principal
LIPMAN
Installation
Suspended Underbridge Access and Containment Scaffold
Related items
Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF: Suspended Scaffolding and overhead protection. FEATURES: Suspended and encapsulated catch deck over water –…
NORTHCONNEX TUNNEL – WILSON SHAFT
Brief Design & Install a suspended access stairs which can be progressively extended down the…
MERCURE HOTEL – BALCONY REMEDIATION SCAFFOLD
Brief Design and Install a 50m high façade scaffold to facilitate remediation and painting of…
PORT BOTANY REDEVELOPMENT PROJECT
Brief Design and install a stretcher stairs and walkway bridge to provide access over the…