Brief
Design & Install a suspended scaffold installation to the underside of the pedestrian bridge over Military Road, Spit Junction, to facilitate demolition of the existing bridge superstructure and construction of a new modern superstructure with billboards. The design and installation methodology to minimise traffic disruption and permit all demolition and construction works to proceed over the live traffic without restrictions.
Fatures
- Preassembled 12m long trusses (9) delivered on semi-trailer and craned into position.
- Containment Deck Area -28m x 12m
- three upper working levels along both sides
- Ties designed to permit unimpeded construction of the new bridge structure
- Double skin containment system with printed façade replication
Share
Project Name
Bridgepoint, SPIT JUNCTION
Principal
LIPMAN
Installation
Suspended Underbridge Access and Containment Scaffold
Related items
WIN STADIUM, WOLLONGONG
Brief Design and install a propping tower installation to support the 100 Tonne stadium roof…
BARANGAROO TOWER 1
Brief Design and install a falsework solution to allow pouring of crane penetration infills at…
SYDNEY CRICKET GROUND UPGRADE
Brief Design and Install BCC compliant stairway installation to provide temporary public stair access between…
Westmead Hospital – Core cladding repair – Winch driven scaffold
BRIEF: Above were asked by their client to provide an efficient solution to replace cladding…