BRIDGEPOINT, SPIT JUNCTION
Brief
Design & Install a suspended scaffold installation to the underside of the pedestrian bridge over Military Road, Spit Junction, to facilitate demolition of the existing bridge superstructure and construction of a new modern superstructure with billboards. The design and installation methodology to minimise traffic disruption and permit all demolition and construction works to proceed over the live traffic without restrictions.
Fatures
- Preassembled 12m long trusses (9) delivered on semi-trailer and craned into position.
- Containment Deck Area -28m x 12m
- three upper working levels along both sides
- Ties designed to permit unimpeded construction of the new bridge structure
- Double skin containment system with printed façade replication
Share
Project Name
Bridgepoint, SPIT JUNCTION
Principal
LIPMAN
Installation
Suspended Underbridge Access and Containment Scaffold
Related items
Sydney University – Engineering Building
BRIEF: Design & Installation of specialized scaffolding throughout the project FEATURES: Internal birdcage scaffold &…
CHATSWOOD TO EPPING RAIL LINK – EPPING RAILWAY STATION
Brief Design and install a suspended, multi-tiered roof perimeter scaffold to provide working platforms and…
Westmead Hospital – Core cladding repair – Winch driven scaffold
BRIEF: Above were asked by their client to provide an efficient solution to replace cladding…
Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF: Suspended Scaffolding and overhead protection. FEATURES: Suspended and encapsulated catch deck over water –…