CENTRAL PARK
Brief
Design and install modular special duty swinging stages to facilitate installation and planting of the feature green wall installations. Stages to be configured to minimise risk of contact with wire trellis
Features
- Working Load Limit 3 persons + 200kg materials
- Stage lengths variable up to 12m
- Powered wire rope reelers to gather and manage trailing ropes
- Access into stage from roof level
- Load Lmiters to manage risk of fouling with façade elements
Share
Project Name
Central Park
Principal
WATPAC
Installation
Swinging Stages For Green Wall Installation
Categories
Related items
BRIDGEPOINT, SPIT JUNCTION
Brief Design & Install a suspended scaffold installation to the underside of the pedestrian bridge…
Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF: Suspended Scaffolding and overhead protection. FEATURES: Suspended and encapsulated catch deck over water –…
Transport for NSW – Sydney Harbour Bridge
BRIEF: Design, Install & Relocation of Cross Girder Scaffolds suspended from the underside of the…
MERCURE HOTEL – BALCONY REMEDIATION SCAFFOLD
Brief Design and Install a 50m high façade scaffold to facilitate remediation and painting of…