BRIEF:
Complete access package including a Large-scale overhead protection throughout the Atrium. Suspended scaffolding & Swinging stages covered the external façade.
An MBA was awarded to SHAPE for this project, focusing on SCAFFOLDING and their commitment to site safety.
FEATURES:
- Internal Atrium Overhead protection – 135m in length x 16m High
- External sawtooth shaped façade scaffold projecting up 24m in height and spanning the full length of the feature façade (~100m) Inclusive of shrink-wrapped roof for complete containment during replacement of cladding
- 14 x Swinging Stages in use and running at the same time
Share
Categories
Related items
Westmead Hospital – Core cladding repair – Winch driven scaffold
BRIEF: Above were asked by their client to provide an efficient solution to replace cladding…
Macquarie University Hospital – Swinging Stages- Clading Replacement
BRIEF: Swinging Stagesfor Cladding replacement FEATURES: Swinging Stages projecting through plant room rooves x 9…
NORTHCONNEX TUNNEL – WILSON SHAFT
Brief Design & Install a suspended access stairs which can be progressively extended down the…
WIN STADIUM, WOLLONGONG
Brief Design and install a propping tower installation to support the 100 Tonne stadium roof…