NATIONAL CIRCUIT
Brief
Design and install a large area work & containment bridging platform over the atrium void, to provide access for glass roof installation. Design and install a travelling large area work and containment platform, suspended from the bridging scaffold, to travel from level to level, to facilitate installation of slab edge cladding and balustrades while enabling groundworks to proceed simultaneously.
Features
- Bridging Platform Area – 9m x 20m
- Travelling Platform Area -7.5m x 18m
- Vertical Travel – 30m
- Traveling Platform powered by two pairs of 240V, 20A electric scaffold hoists
- Independent overspeed safety brakes operate in tandem with hoists.
Share
Project Name
National Circuit
Principal
Lend Lease
Installation
Over-Void 'SKYDECK' Platform With Travelling Void IN-FILL Platform
Related items
Sydney Harbour Bridge – Main Span Cross Girder Painting
Brief Design & Install suspended encapsulation scaffold installations to facilitate preparation and painting of the…
BARANGAROO TOWER 1
Brief Design and install a custom cantilevered loading platform to install 3 sections of a…
Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF: Suspended Scaffolding and overhead protection. FEATURES: Suspended and encapsulated catch deck over water –…
SYDNEY CRICKET GROUND UPGRADE
Brief Design and Install BCC compliant stairway installation to provide temporary public stair access between…