NORTHCONNEX – DARLING MILLS BRIDGE WIDENING
Brief
Design & install various stretcher stair installations to provide safe access to the abutments and pier footings. Stairs to be configured to suit the terrain while maintaining full stretcher stair compliance.
Features
- Stretcher Stair compliance with 2.5kPa rating
- Rockbolt anchors into sandstone.
- Stairs incorporating bridging and cantilevered elements as dictated by the terrain.
Share
Project Name
NorthConnex - Darling Mills Bridge Widening
Principal
Lend Lease Bouygues JV
Installation
Site Access Stretcher Stairs
Categories
Related items
BRIDGEPOINT, SPIT JUNCTION
Brief Design & Install a suspended scaffold installation to the underside of the pedestrian bridge…
VILLAGE QUAY, RHODES
Brief Design and install a monorail and swinging stage installation to provide rapid access over…
Macquarie University Hospital – Swinging Stages- Clading Replacement
BRIEF: Swinging Stagesfor Cladding replacement FEATURES: Swinging Stages projecting through plant room rooves x 9…