Above Scaffolding

MAJOR PROJECTS

Barangaroo

BARANGAROO TOWER 3

PROJECT:
Barangaroo
PRINCIPAL:
LEND LEASE
INSTALLATION:
ROLL IN / ROLL OUT CANTILEVERED CATCH PLATFORM
BRIEF:
Design & Install a cantilevered catch & containment platform installation to be relocated progressively up the tower, providing overhead protection to enable facade pop-outs to be installed without interruption to groundworks below. The design and methodology to allow the scaffold to be launched, retracted and relocated in the shortest possible time to support program continuity.
FEATURES
Cantilevered Catch Platform Area - 5m x 33m with 5kPa load rating
Tracks fixed to slab to guide travel on 30kN profiled steel wheels.
Platform assembled from mobile trusses craned between levels via the loading platforms.
Time to launch or retract the platform was 1 hour approximately.

TESTIMONIAL