Hawkesbury Rail Bridge – Containment – Work Decks
BRIEF:
Design and install catch / work platforms below the up and down rail lines, and in the cess. Access for re-transforming and re-railing works during rail shutdowns.
FEATURES:
- Integrated scaffold platforms bearing to existing bridge steel members. Fall protection for workers on rail.
- Platforms installed and relocated from existing bridge maintenance gantry, coverage of entire bridge spans achievable for maximizing work productivity during limited time frame rail shutdowns.
- Installation of platforms could be undertaken during normal hours, in preparation for rail shutdowns. Management of waterways below achieved during day works.
Share
Categories
Related items
BARANGAROO TOWER 1
Brief Design and install a falsework solution to allow pouring of crane penetration infills at…
CENTRAL PARK
Brief Design and install modular special duty swinging stages to facilitate installation and planting of…
Transport for NSW – Sydney Harbour Bridge
BRIEF: Design, Install & Relocation of Cross Girder Scaffolds suspended from the underside of the…
PORT BOTANY REDEVELOPMENT PROJECT
Brief Design and install a stretcher stairs and walkway bridge to provide access over the…