Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF:
Suspended Scaffolding and overhead protection.
FEATURES:
- Suspended and encapsulated catch deck over water – 40m x 4m
- 10kPa overhead protection over roadways
Share
Categories
Related items
Sydney Harbour Bridge – Main Span Cross Girder Painting
Brief Design & Install suspended encapsulation scaffold installations to facilitate preparation and painting of the…
NATIONAL CIRCUIT
Brief Design and install a large area work & containment bridging platform over the atrium…
SYDNEY CRICKET GROUND UPGRADE
Brief Design and Install BCC compliant stairway installation to provide temporary public stair access between…
Shape Star Casino
BRIEF: Design & Install Scaffolding and Swinging Stages for recladding FEATURES: 50t Birdcage within Lobby…