Westmead Hospital – Core cladding repair – Winch driven scaffold
BRIEF:
Above were asked by their client to provide an efficient solution to replace cladding on the 2 upper levels of the building. Individual cladding pieces were 3.8m in height each – Scaffolding was the solution.
A winch driven suspended scaffold was designed and installed with a 450kg WLL. This approach removed the need to scaffold from the base of the building to the top which would have added more time into the program and façade penetration for scaffold ties at each finished floor.
FEATURES:
- Scaffold was erected on ground floor then driven up into position in 3 sections
Share
Categories
Related items
MERCURE HOTEL – BALCONY REMEDIATION SCAFFOLD
Brief Design and Install a 50m high façade scaffold to facilitate remediation and painting of…
NORTHCONNEX TUNNEL – WILSON SHAFT
Brief Design & Install a suspended access stairs which can be progressively extended down the…
WIN STADIUM, WOLLONGONG
Brief Design and install a propping tower installation to support the 100 Tonne stadium roof…
BARANGAROO TOWER 1
Brief Design and install a falsework solution to allow pouring of crane penetration infills at…