SYDNEY HARBOUR BRIDGE REFURBISHMENT
Brief
Design and install a suspended scaffold installation to the underside of the Sydney Harbour Bridge southern approach, over Cumberland Street, to facilitate grit blasting and painting of the bridge trusses and cross frames while maintaining unrestricted pedestrian and vehicle access, and without disruption to BridgeClimb operations.
Features
- 30m long aluminium trusses delivered as pre-assembled modules and hoisted into position.
- Scaffold suspended from X wire rope slings anchored to the bridge stringers.
- Containment Deck Area – 32m x 22m
- Height of perimeter scaffolds above deck – 12m
- Overhead protection acccess tunnel for BridgeClimb tour groups.
Share
Project Name
Sydney Harbour Bridge Refurbishment
Principal
Roads & Maritme Services
Installation
Suspended Underbridge Perimeter Scaffolds & Containment Deck
Related items
VILLAGE QUAY, RHODES
Brief Design and install a monorail and swinging stage installation to provide rapid access over…
MERCURE HOTEL – BALCONY REMEDIATION SCAFFOLD
Brief Design and Install a 50m high façade scaffold to facilitate remediation and painting of…
Macquarie University Hospital – Swinging Stages- Clading Replacement
BRIEF: Swinging Stagesfor Cladding replacement FEATURES: Swinging Stages projecting through plant room rooves x 9…
BARANGAROO TOWER 1
Brief Design and install a custom cantilevered loading platform to install 3 sections of a…