SYDNEY HARBOUR BRIDGE REFURBISHMENT
Brief
Design and install a suspended scaffold installation to the underside of the Sydney Harbour Bridge southern approach, over Cumberland Street, to facilitate grit blasting and painting of the bridge trusses and cross frames while maintaining unrestricted pedestrian and vehicle access, and without disruption to BridgeClimb operations.
Features
- 30m long aluminium trusses delivered as pre-assembled modules and hoisted into position.
- Scaffold suspended from X wire rope slings anchored to the bridge stringers.
- Containment Deck Area – 32m x 22m
- Height of perimeter scaffolds above deck – 12m
- Overhead protection acccess tunnel for BridgeClimb tour groups.
Share
Project Name
Sydney Harbour Bridge Refurbishment
Principal
Roads & Maritme Services
Installation
Suspended Underbridge Perimeter Scaffolds & Containment Deck
Related items
PORT BOTANY REDEVELOPMENT PROJECT
Brief Design and install a stretcher stairs and walkway bridge to provide access over the…
Westmead Hospital – Core cladding repair – Winch driven scaffold
BRIEF: Above were asked by their client to provide an efficient solution to replace cladding…
Shape ABC
BRIEF: Complete access package including a Large-scale overhead protection throughout the Atrium. Suspended scaffolding &…
Macquarie University Hospital – Swinging Stages- Clading Replacement
BRIEF: Swinging Stagesfor Cladding replacement FEATURES: Swinging Stages projecting through plant room rooves x 9…