SYDNEY HARBOUR BRIDGE REFURBISHMENT
Brief
Design and install a suspended scaffold installation to the underside of the Sydney Harbour Bridge southern approach, over Cumberland Street, to facilitate grit blasting and painting of the bridge trusses and cross frames while maintaining unrestricted pedestrian and vehicle access, and without disruption to BridgeClimb operations.
Features
- 30m long aluminium trusses delivered as pre-assembled modules and hoisted into position.
- Scaffold suspended from X wire rope slings anchored to the bridge stringers.
- Containment Deck Area – 32m x 22m
- Height of perimeter scaffolds above deck – 12m
- Overhead protection acccess tunnel for BridgeClimb tour groups.
Share
Project Name
Sydney Harbour Bridge Refurbishment
Principal
Roads & Maritme Services
Installation
Suspended Underbridge Perimeter Scaffolds & Containment Deck
Related items
BRIDGEPOINT, SPIT JUNCTION
Brief Design & Install a suspended scaffold installation to the underside of the pedestrian bridge…
SALT PAN CREEK RAILWAY BRIDGE TRUSS REPLACEMENT
Brief Design & Install a suspended scaffold installation to the underside of the railway bridge…
WIN STADIUM, WOLLONGONG
Brief Design and install a propping tower installation to support the 100 Tonne stadium roof…
CENTRAL PARK – SKYDECK
Brief Design and install a large area work platform installation to be suspended from the…