VILLAGE QUAY, RHODES
Brief
Design and install a monorail and swinging stage installation to provide rapid access over the full extent of the residential tower façade for installation of architectural window framing. System to permit the stage to operate above the projecting balconies and avoid wire ropes contacting the finished facade.
Features
- 9m long swinging stage travelling on 40m long monorail.
- Powered wire rope reelers to gather and manage the wire ropes
- Working Load Limit 3 persons + 200kg materials
- Stage lengths variable up to 12m
- Load Lmiters to manage risk of fouling with façade elements and overloading the monorail.
Share
Project Name
Village Quay, Rhodes
Principal
Billbergia
Installation
Traveling Swinging Stage On Monorail
Categories
Related items
Sydney University – Engineering Building
BRIEF: Design & Installation of specialized scaffolding throughout the project FEATURES: Internal birdcage scaffold &…
NORTHCONNEX TUNNEL – WILSON SHAFT
Brief Design & Install a suspended access stairs which can be progressively extended down the…
Barangaroo
BARANGAROO TOWER 3 BRIEF: Design & Install a cantilevered catch & containment platform installation to…