WIN STADIUM, WOLLONGONG
Brief
Design and install a propping tower installation to support the 100 Tonne stadium roof truss during removal and replacement. Ensure that the propping scaffold is also designed to resist horizontal forces imposed on the roof structure from 1 in 100 year wind loading.
Features
- Height of Tower – 18m at highest point.
- Incorporates Layher extra heavy duty quad jacks and u-heads.
- Anchored down through the stadium levels to base slab using heavy duty push/pull props
- Tower anchorage designed tension and compression to resist wind loads.
Share
Project Name
Win Stadium, Wollongong
Principal
Lipman
Installation
Mega Duty High Propping Tower & Buttress
Categories
Related items
Barangaroo
BARANGAROO TOWER 3 BRIEF: Design & Install a cantilevered catch & containment platform installation to…
NORTHCONNEX TUNNEL – WILSON SHAFT
Brief Design & Install a suspended access stairs which can be progressively extended down the…
CHATSWOOD TO EPPING RAIL LINK – EPPING RAILWAY STATION
Brief Design and install a suspended, multi-tiered roof perimeter scaffold to provide working platforms and…
Macquarie University Hospital – Swinging Stages- Clading Replacement
BRIEF: Swinging Stagesfor Cladding replacement FEATURES: Swinging Stages projecting through plant room rooves x 9…