Above Scaffolding

MAJOR PROJECTS

CENTRAL PARK

PROJECT:
CENTRAL PARK
PRINCIPAL:
WATPAC
INSTALLATION:
SWINGING STAGES FOR GREEN WALL INSTALLATION
BRIEF:
Design and install modular special duty swinging stages to facilitate installation and planting of the feature green wall installations. Stages to be configured to minimise risk of contact with wire trellis
FEATURES
Working Load Limit 3 persons + 200kg materials
Stage lengths variable up to 12m
Powered wire rope reelers to gather and manage trailing ropes
Access into stage from roof level
Load Lmiters to manage risk of fouling with façade elements

TESTIMONIAL

Get in touch with us

Captcha Image

Subscribe to our Newsletter