Transport for NSW – Sydney Harbour Bridge
BRIEF:
Design, Install & Relocation of Cross Girder Scaffolds suspended from the underside of the road deck for blasting and painting works.
FEATURES:
- 3 x Suspended Scaffolds being relocated along bridge over 18 locations – Each 6m wide, 50m Long with 2 working levels
- Suspended from bridge girders using chains
- Configured to allow free travel of main span gantries below
Share
Categories
Related items
Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF: Suspended Scaffolding and overhead protection. FEATURES: Suspended and encapsulated catch deck over water –…
CHATSWOOD TO EPPING RAIL LINK – EPPING RAILWAY STATION
Brief Design and install a suspended, multi-tiered roof perimeter scaffold to provide working platforms and…
Shape ABC
BRIEF: Complete access package including a Large-scale overhead protection throughout the Atrium. Suspended scaffolding &…
Barangaroo
BARANGAROO TOWER 3 BRIEF: Design & Install a cantilevered catch & containment platform installation to…