CENTRAL PARK – SKYDECK
Brief
Design and install a large area work platform installation to be suspended from the cantilevered Heliostat structure, some 100m above ground, to facilitate installation of sofit superstructure and cladding. Installation and dismantle methodologies to minimise risks associated with working at height.
Scaffold installation to be designed for 1 in 100 year wind event.
Features
- Skydeck Area – 15m x 5m
- Skydeck assembled at ground level and then raised up to position using scaffold hoists.
- Skydeck secured in working position with suspension chains.
- Access onto skydek from skygarden above.
Share
Project Name
Central Park - Skydeck
Principal
WATPAC
Installation
Suspended Traveling 'SKYDECK'
Related items
Transport for NSW – Sydney Harbour Bridge
BRIEF: Design, Install & Relocation of Cross Girder Scaffolds suspended from the underside of the…
Sydney Harbour Bridge – Main Span Cross Girder Painting
Brief Design & Install suspended encapsulation scaffold installations to facilitate preparation and painting of the…
CHATSWOOD TO EPPING RAIL LINK – EPPING RAILWAY STATION
Brief Design and install a suspended, multi-tiered roof perimeter scaffold to provide working platforms and…
BRIDGEPOINT, SPIT JUNCTION
Brief Design & Install a suspended scaffold installation to the underside of the pedestrian bridge…