PORT BOTANY REDEVELOPMENT PROJECT
Brief
Design and install a stretcher stairs and walkway bridge to provide access over the rail corridor between the work site and the site compound. The design to ensure the installation does not encroach into the rail corridor. The installation methodology to minimise track possession duration.
Features
- 14.5m clear span bridge suspended between stretcher stair tower abutments.
- Bridge pre-assembled then craned into position and connected to stair towers.
- 1.4m wide bridge and stairways.
- Stair towers anchored to concrete barriers for stability and wind resistance.
- 2.5kPa load rating.
Share
Project Name
Port Botany Redevelopment Project
Principal
Fulton Hogan
Installation
Access Bridge With Stairs
Categories
Related items
NORTHCONNEX – DARLING MILLS BRIDGE WIDENING
Brief Design & install various stretcher stair installations to provide safe access to the abutments…
CENTRAL PARK
Brief Design and install modular special duty swinging stages to facilitate installation and planting of…
Shape ABC
BRIEF: Complete access package including a Large-scale overhead protection throughout the Atrium. Suspended scaffolding &…
CENTRAL PARK – SKYDECK
Brief Design and install a large area work platform installation to be suspended from the…