WIN STADIUM, WOLLONGONG
Brief
Design and install a propping tower installation to support the 100 Tonne stadium roof truss during removal and replacement. Ensure that the propping scaffold is also designed to resist horizontal forces imposed on the roof structure from 1 in 100 year wind loading.
Features
- Height of Tower – 18m at highest point.
- Incorporates Layher extra heavy duty quad jacks and u-heads.
- Anchored down through the stadium levels to base slab using heavy duty push/pull props
- Tower anchorage designed tension and compression to resist wind loads.
Share
Project Name
Win Stadium, Wollongong
Principal
Lipman
Installation
Mega Duty High Propping Tower & Buttress
Categories
Related items
CHATSWOOD TO EPPING RAIL LINK – EPPING RAILWAY STATION
Brief Design and install a suspended, multi-tiered roof perimeter scaffold to provide working platforms and…
Barangaroo
BARANGAROO TOWER 3 BRIEF: Design & Install a cantilevered catch & containment platform installation to…
Shape ABC
BRIEF: Complete access package including a Large-scale overhead protection throughout the Atrium. Suspended scaffolding &…
Hawkesbury Rail Bridge – Containment – Work Decks
BRIEF: Design and install catch / work platforms below the up and down rail lines,…