Sydney Harbour Bridge - Main Span Cross Girder Painting

PROJECT:
Sydney Harbour Bridge - Main Span Cross Girder Painting
PRINCIPAL:
RMS
INSTALLATION:
SUSPENDED UNDERDECK ACCESS AND CONTAINMENT SCAFFOLDS
BRIEF:
Design & Install suspended encapsulation scaffold installations to facilitate preparation and painting of the main span cross girders. The design and methodology to ensure no obstruction to the travel of the main span gantry, and to allow the scaffolds to be readily relocated from cross girder to cross girder.
FEATURES
each scaffold is 50m long x 7m wide x 3m high
84 suspension chain assemblies per scaffold
Access onto scaffolds from bridge catwalks