MERCURE HOTEL – BALCONY REMEDIATION SCAFFOLD
Brief
Design and Install a 50m high façade scaffold to facilitate remediation and painting of the hotel balconies, including design and fabrication of special ties to clamp the scaffold to the balcony structures, avoiding the need for drilled-in anchors while resisting very high wind loads.
Features
- 50m High Scaffold with working decks every 2m.
- Access from the balconies as well as via internal ladder access.
- Special tie-in clamps.
Share
Project Name
Mercure Hotel - Balcony Remediation Scaffold
Principal
MBS PAINTING
Installation
50M High Facade Scaffold Tower
Categories
Related items
Westmead Hospital – Core cladding repair – Winch driven scaffold
BRIEF: Above were asked by their client to provide an efficient solution to replace cladding…
Carramar Rail Bridge – Containment – Protection decks – Retransoming
BRIEF: Suspended Scaffolding and overhead protection. FEATURES: Suspended and encapsulated catch deck over water –…
NORTHCONNEX TUNNEL – WILSON SHAFT
Brief Design & Install a suspended access stairs which can be progressively extended down the…
WIN STADIUM, WOLLONGONG
Brief Design and install a propping tower installation to support the 100 Tonne stadium roof…