BRIDGEPOINT, SPIT JUNCTION

PROJECT:
BRIDGEPOINT, SPIT JUNCTION
PRINCIPAL:
LIPMAN
INSTALLATION:
SUSPENDED UNDERBRIDGE ACCESS AND CONTAINMENT SCAFFOLD
BRIEF:
Design & Install a suspended scaffold installation to the underside of the pedestrian bridge over Military Road, Spit Junction, to facilitate demolition of the existing bridge superstructure and construction of a new modern superstructure with billboards. The design and installation methodology to minimise traffic disruption and permit all demolition and construction works to proceed over the live traffic without restrictions.
FEATURES
Preassembled 12m long trusses (9) delivered on semi-trailer and craned into position.
Containment Deck Area -28m x 12m
three upper working levels along both sides
Ties designed to permit unimpeded construction of the new bridge structure
Double skin containment system with printed façade replication