BARANGAROO TOWER 1

PROJECT:
BARANGAROO TOWER 1
PRINCIPAL:
LEND LEASE
INSTALLATION:
FALSEWORK SCAFFOLDS
BRIEF:
Design and install a falsework solution to allow pouring of crane penetration infills at 3 levels, simultaneously. All penetrations directly above each other. Falsework needed to span over the penetration below, while allowing formwork installation to pour the slab above.
FEATURES
Falsework structures were built away from edge of penetration and rolled into position
Access was maintained to pour the L03, L02 and L01 infills without obstruction due to falsework spanning over the voids
U head jacks and internal ladder access allowed traditional formwork to be insalled quickly and safely