Hawkesbury Rail Bridge – Containment – Work Decks
BRIEF:
Design and install catch / work platforms below the up and down rail lines, and in the cess. Access for re-transforming and re-railing works during rail shutdowns.
FEATURES:
- Integrated scaffold platforms bearing to existing bridge steel members. Fall protection for workers on rail.
- Platforms installed and relocated from existing bridge maintenance gantry, coverage of entire bridge spans achievable for maximizing work productivity during limited time frame rail shutdowns.
- Installation of platforms could be undertaken during normal hours, in preparation for rail shutdowns. Management of waterways below achieved during day works.
Share
Categories
Related items
SYDNEY CRICKET GROUND UPGRADE
Brief Design and Install BCC compliant stairway installation to provide temporary public stair access between…
Sydney University – Engineering Building
BRIEF: Design & Installation of specialized scaffolding throughout the project FEATURES: Internal birdcage scaffold &…
NATIONAL CIRCUIT
Brief Design and install a large area work & containment bridging platform over the atrium…
MERCURE HOTEL – BALCONY REMEDIATION SCAFFOLD
Brief Design and Install a 50m high façade scaffold to facilitate remediation and painting of…