Shape Star Casino
BRIEF:
Design & Install Scaffolding and Swinging Stages for recladding
FEATURES:
- 50t Birdcage within Lobby installed, relocated and removed within a 3month time frame
- 2 x Swinging Stages and over head protection for external stair core walls
- The building remained open at all times