CENTRAL PARK
Brief
Design and install modular special duty swinging stages to facilitate installation and planting of the feature green wall installations. Stages to be configured to minimise risk of contact with wire trellis
Features
- Working Load Limit 3 persons + 200kg materials
- Stage lengths variable up to 12m
- Powered wire rope reelers to gather and manage trailing ropes
- Access into stage from roof level
- Load Lmiters to manage risk of fouling with façade elements
Share
Project Name
Central Park
Principal
WATPAC
Installation
Swinging Stages For Green Wall Installation
Categories
Related items
Sydney University – Engineering Building
BRIEF: Design & Installation of specialized scaffolding throughout the project FEATURES: Internal birdcage scaffold &…
Barangaroo
BARANGAROO TOWER 3 BRIEF: Design & Install a cantilevered catch & containment platform installation to…
Hawkesbury Rail Bridge – Containment – Work Decks
BRIEF: Design and install catch / work platforms below the up and down rail lines,…
Transport for NSW – Sydney Harbour Bridge
BRIEF: Design, Install & Relocation of Cross Girder Scaffolds suspended from the underside of the…