SALT PAN CREEK RAILWAY BRIDGE TRUSS REPLACEMENT
Brief
Design & Install a suspended scaffold installation to the underside of the railway bridge over Salt Pan Creek at Riverwood, to facilitate replacement of one of the bridge trusses as well as water blasting and painting of the bridge structure. The design and methodology to allow the scaffold to be installed and removed without disruption to train movements, and to maintain access for water craft.
Features
A barge fitted with a crane and boom lift was used to enable all work to be carried out without the need to access the rail corridor.
- Containment Deck Area – 80m x 12m
- Central trough to channel and collect run-off.
- Upper level walkways along both sides
- Stair access up to track level at each abutment
Share
Project Name
Salt Pan Creek Railway Bridge Truss Replacement
Principal
Sydney Trains
Installation
Suspended Underbridge Access & Containment Scaffold
Related items
CENTRAL PARK – SKYDECK
Brief Design and install a large area work platform installation to be suspended from the…
NORTHCONNEX TUNNEL – WILSON SHAFT
Brief Design & Install a suspended access stairs which can be progressively extended down the…
BARANGAROO TOWER 1
Brief Design and install a custom cantilevered loading platform to install 3 sections of a…
Macquarie University Hospital – Swinging Stages- Clading Replacement
BRIEF: Swinging Stagesfor Cladding replacement FEATURES: Swinging Stages projecting through plant room rooves x 9…