Sydney Harbour Bridge – Main Span Cross Girder Painting
Brief
Design & Install suspended encapsulation scaffold installations to facilitate preparation and painting of the main span cross girders. The design and methodology to ensure no obstruction to the travel of the main span gantry, and to allow the scaffolds to be readily relocated from cross girder to cross girder.
Features
- Each scaffold is 50m long x 7m wide x 3m high
- 84 suspension chain assemblies per scaffold
- Access onto scaffolds from bridge catwalks
Share
Project Name
Sydney Harbour Bridge - Main Span Cross Girder Painting
Principal
RMS
Installation
Suspended Underdeck Access and Containment Scaffolds
Related items
BARANGAROO TOWER 1
Brief Design and install a falsework solution to allow pouring of crane penetration infills at…
SYDNEY HARBOUR BRIDGE REFURBISHMENT
Brief Design and install a suspended scaffold installation to the underside of the Sydney Harbour…
CENTRAL PARK
Brief Design and install modular special duty swinging stages to facilitate installation and planting of…
Shape Star Casino
BRIEF: Design & Install Scaffolding and Swinging Stages for recladding FEATURES: 50t Birdcage within Lobby…