Sydney Harbour Bridge – Main Span Cross Girder Painting
Brief
Design & Install suspended encapsulation scaffold installations to facilitate preparation and painting of the main span cross girders. The design and methodology to ensure no obstruction to the travel of the main span gantry, and to allow the scaffolds to be readily relocated from cross girder to cross girder.
Features
- Each scaffold is 50m long x 7m wide x 3m high
- 84 suspension chain assemblies per scaffold
- Access onto scaffolds from bridge catwalks
Share
Project Name
Sydney Harbour Bridge - Main Span Cross Girder Painting
Principal
RMS
Installation
Suspended Underdeck Access and Containment Scaffolds
Related items
Transport for NSW – Sydney Harbour Bridge
BRIEF: Design, Install & Relocation of Cross Girder Scaffolds suspended from the underside of the…
Built Core – 4 & 6-8 Parramatta Square – Link Bridge Installation Scaffold
BRIEF: Design and install containment and work perimeter scaffold spanning from one building to adjacent…
CHATSWOOD TO EPPING RAIL LINK – EPPING RAILWAY STATION
Brief Design and install a suspended, multi-tiered roof perimeter scaffold to provide working platforms and…
Westmead Hospital – Core cladding repair – Winch driven scaffold
BRIEF: Above were asked by their client to provide an efficient solution to replace cladding…