Above Scaffolding

MAJOR PROJECTS

LAWRENCE HARGRAVE DRIVE

PROJECT:
LAWRENCE HARGRAVE DRIVE
PRINCIPAL:
RMS
INSTALLATION:
SUSPENDED ACCESS AND CONTAINMENT SCAFFOLD UNDER SUSPENDED FOOTPATH
BRIEF:
Design and install an access and containment scaffold suspended from the LHD footpath to provide access along the outside and underneath the footpath for its full extent tofacilitate concrete repair and painting. The design and installation methodology to enable the scaffold to be installed without working from the embankment. All debris and paint to be fully contained.
FEATURES
100m long suspended access and containment scaffold.
Stair access up and over the edge railing at both ends.
Medium Duty Rating.
Pre-assembled modules delivered and lifted into position using a crane truck.
Special kerb brackets to secure and suspend the scaffold installed from the footpath.

TESTIMONIAL

Get in touch with us

Captcha Image